Skip to content
    Guide

    Approving Gus fixes

    Last updated

    Gus never fixes anything on its own. When it finds a problem, or you ask it for a change, it writes a fix plan: a list of changes, each with a plain-English explanation, a risk level and the exact change it will make. Nothing happens until you approve.

    You approve each fix for each environment separately. That means you can say "yes, but only on staging for now", and decide about the live site later. This guide covers the fix plan screen, every button on it, and the other ways to approve.

    Opening a fix plan

    Fix plans live on the Fix plans tab of Diagnose & fix. Choose the site at the top right; if it has more than one plan, choose one from the selector, which lists each plan’s date and status. If Gus sent you a link from the chat, it opens the right plan directly.

    At the top of the plan is Gus’s summary. Below it, each fix has its own box showing:

    • The title of the fix and its risk badge: low, medium or high.
    • A short description of what it does and why.
    • The change itself. Lines starting with + are added and lines starting with - are removed. For content changes it shows the old text and the new text, as the site was when Gus drafted it.
    • A Deploy to row with a tick box for each linked environment of the site.

    Gus writes the summary, but it cannot add or alter the changes themselves. Each fix comes from a fixed list of actions MaintainHQ knows how to apply, back up and undo, or from a content or code change you can read in full.

    What the risk levels mean

    Risk levels
    RiskTypical examplesSuggested approach
    LowClearing out expired temporary data, adding alt text from image titles, hiding the WordPress version.Usually fine to approve straight to production.
    MediumUpdating a plugin, adding security headers, repairing scheduled tasks.Try on staging first if you have it.
    HighDeactivating or rolling back a plugin or theme, moving the site to HTTPS, code changes.Apply to staging first, check it, then promote to production.

    When you tick production for a high-risk fix and the site has a staging environment that has not had the fix yet, Gus shows a reminder: "Recommended: apply this to staging first, then promote it to production once it checks out." See Choosing staging or production for each fix.

    Approving one fix or a few

    1. In each fix you want, tick the environments under Deploy to. Press exact change next to an environment to see precisely what would change there.
    2. Press Approve selected. The number in brackets counts each fix and environment pair you ticked.
    3. A confirmation box lists every fix and the environments it will run on. Gus makes exactly these changes and nowhere else.
    4. Press Approve. A message confirms how many approvals were recorded.

    Each approved fix then shows "Approved for staging, waiting to run" (or whichever environment) while it queues, followed by its progress: Backing up, Applying, Verifying, and finally the result. The page updates by itself.

    Approving every fix at once

    Press Approve all… to approve every fix in the plan that you have not rejected. The confirmation box asks which environments to deploy every fix to, lists the result, and needs at least one environment ticked before Approve works.

    An approve-all is recorded as such on each approval, so you can always tell later whether a fix was approved on its own or as part of a batch.

    Rejecting a fix or cancelling an approval

    To turn down a fix, press Reject in its box. This is only offered before the fix has been approved anywhere. A rejected fix stays in the plan, marked as rejected, and is left out of Approve all.

    Changed your mind after approving? While a fix shows "waiting to run" or "Scheduled for", press Cancel next to it. Once it has started backing up, it runs to the end, and you can use Undo afterwards if you do not want to keep it.

    Approving from an email link

    Press Email me approval links at the bottom of a plan to receive approve and reject links for each fix. It is useful when you want to decide from your phone, or forward the decision to someone else on your account.

    • Each link works once and expires after 24 hours.
    • Opening a link only shows what it would do: the fix, its risk, the change and the environment. Nothing happens until you press Approve on staging (or the environment named) or Reject fix on that page.
    • If you have switched off "Gus fixes awaiting approval" alerts, the links go to your notifications in MaintainHQ instead. If you get these alerts as a digest, they are added to your next digest.

    Maintenance windows

    If a site has an update window set (under Update Windows on the Plugins page), Gus respects it. When you approve a fix for that environment, the confirmation box says when the window opens, and the fix waits until then. The fix shows "Scheduled for" with the date and time.

    To run a fix straight away anyway, tick Run now, outside the maintenance window in the confirmation box, or press Run now next to a scheduled fix later.

    Frequently asked questions

    Can someone approve a fix by accident just by clicking an email link?
    No. Opening the link only shows what the fix would do. The approval only happens when the button on that page is pressed, and each link works once and expires after 24 hours.
    Can I approve a fix for staging now and production later?
    Yes. Approve it for staging only. When it shows "Applied and verified", a Promote to production button appears, which needs its own approval.
    What is recorded when I approve?
    Who approved it, when, for which environment, whether it came from an email link, and whether it was part of an approve-all. You see this under each fix, and it is on the receipt.
    Can I make some fixes run without approving each one?
    Yes, with a standing approval rule, for example "low-risk fixes on staging". See [Keeping Gus safe](/guides/gus-permissions-and-safety).

    Let MaintainHQ run the routine

    Updates with automatic rollback, backups, uptime, security checks and client reports, with Gus to fix what breaks.

    Start free trial

    From £29 a month for up to 2 sites. Every plan starts with a 14-day trial.